KERN Tunneltechnik SA
Palazzo Geretta
Via Zorzi 4 - Lugano-Paradiso
CH-6900 - Switzerland
P. 0041 91 921 48 91
F. 0041 91 921 48 92
info@kern-tunneltechnik.com
Pre-assembly and testing completed for innovative Drilling Gantry for T2D Project
We are pleased to share the successful completion of the pre-assembly and testing of innovative tunnel bottom drilling gantries, in close collaboration with our colleagues at PERI Create in Weissenhorn.
The system is a special drilling rig designed to accelerate service installations for the River Torrens to Darlington (T2D) Project in Australia, a major infrastructure undertaking that will deliver the final 10.5 km section of the North–South Corridor and complete a 78 km traffic light-free motorway between Gawler and Old Noarlunga.
The gantries are now being disassembled and prepared for delivery to Australia.
Thank you to everyone involved for the strong teamwork.


Website by Redesign
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).