KERN Tunneltechnik SA
Palazzo Geretta
Via Zorzi 4 - Lugano-Paradiso
CH-6900 - Switzerland
P. 0041 91 921 48 91
F. 0041 91 921 48 92
info@kern-tunneltechnik.com
The "H53 Pfons-Brenner" construction lot is a significant segment of the Brenner Base Tunnel project. As the largest construction lot on the Austrian side of the project, it encompasses the excavation of approximately 25.2 kilometers of main tunnel, extending from Pfons to the Austrian-Italian border at Brenner.
The scope of work includes the mechanized excavation of 15.2 kilometers of main tunnel using Tunnel Boring Machines (TBMs) directed northward, and an additional 10 kilometers of main tunnel excavated through drilling and blasting methods. Furthermore, the project involves the construction of 1.3 kilometers of exploratory tunnel and 2.6 kilometers of cross-connecting tunnels.
Website by Redesign
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).