26.02.2019 /

Albvorlandtunnel Formwork ready to start

The NBS Albvorlandtunnel formwork has been assembled on site and it's ready to start with the secondary lining works.
Kern Tunneltechnik is suppling in total 4 Vault Formworks, 2 Parament Formworks, Reinforcement and Magazine gantries.