INVERT
FORMWORK

Intended for the construction of the tunnel invert previous the vault section. The formwork can be designed to create a specific shape of the tunnel invert according customer requirements. The transport is performed by a double length telescopic traveller.

High up-lift concrete pressure is controlled by a bespoke structure that reacts on the primary lining.
The is provided with platforms to reach all the working areas.

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject