Location: Hessisch Lichtenau - Germany
Customer: Baresel GmbH
Working years: 2014 / 2017
Project information: The tunnel is designed as a double tube tunnel with two lanes each. The tunnel tubes are connected with each other by cross passages. The northern tunnel tube has a length of 4,128 m, and the southern tube has a total length of 4,187 m. After its completion, the Hirschhagen Tunnel will be Germany’s second longest motorway tunnel.
Supplied equipments: Supply of 2 complete secondary lining trains composed of Formworks, Curing gantries, Reinforcement-Magazine gantries, Service Gantries.
Enlargement formwork for tunnel widening.
2 By-pass shutters for connections between the two tunnel lines.
Ancillary material such as connection collars and niches.
Additional Services:
Machine installation , Concrete secondary lining works , Machine Transformations , Machine Removal , Reinforcement Works , Supervision ,
![IMG_1563[2].jpg IMG_1563[2].jpg](https://www.kern-tunneltechnik.com/upload/multimedia/2017.09.13.02.20.529505.jpg)
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).