Location: Karlsruhe - Germany
Customer: BeMo Tunnelling GmbH
Working years: 2017
Project information: As part of the project named Kombilösung Karlsruhe, the Tunnel Karl Friedrichstraße with its length of 250 m connects the station Ettlinger Tor with the station Marktplatz in the heart of the city.
Supplied equipments: Supply of a Formwork and a Reinforcement gantry able to be converted inside the tunnel to realize the secondary lining works of a trumpet section.
In relation to the work sequence, it was decided to start from the biggest block, reducing block by block the dimension of the machines up to the standard blocks in “Regelprofil”.
Formwork and Reinforcement gantry have been developed considering this challenging situation.
Both systems work with two transporting gantries (right and left) able to move independently during the advancement.
For the central trumpet enlargement, it was used the TSK modular system as a supporting structure for the deck forms.
The project presented critical aspects in relation to the construction program and it was realized in compressed air conditions.
All the machines have been completely pre-assembled previous delivery and installation on site.
Additional Services:
Machine installation , Machine Transformations , Machine Removal ,


Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).