20.09.2018 /
The Hydrostatic Formwork manufactured for Bözbergtunnel is assembled in jobsite and ready to start with the works.
The machine is also designed to be modified and adapted to 4 different geometries.
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).