Array ( [0] => 1 [1] => 2 [2] => 3 [3] => 4 [4] => 5 [5] => 7 )

Tunnel Hirschhagen

Location: Hessisch Lichtenau - Germany
Customer: Baresel GmbH
Working years: 2014 / 2017
Project information: The tunnel is designed as a double tube tunnel with two lanes each. The tunnel tubes are connected with each other by cross passages. The northern tunnel tube has a length of 4,128 m, and the southern tube has a total length of 4,187 m. After its completion, the Hirschhagen Tunnel will be Germany’s second longest motorway tunnel.
Supplied equipments: Supply of 2 complete secondary lining trains composed of Formworks, Curing gantries, Reinforcement-Magazine gantries, Service Gantries.
Enlargement formwork for tunnel widening.
2 By-pass shutters for connections between the two tunnel lines.
Ancillary material such as connection collars and niches.
Additional Services: Machine installation , Concrete secondary lining works , Machine Transformations , Machine Removal , Reinforcement Works , Supervision ,

Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm