Location: Hessisch Lichtenau - Germany 
            Customer: Baresel GmbH
            Working years: 2014 / 2017
            Project information: The tunnel is designed as a double tube tunnel with two lanes each. The tunnel tubes are connected with each other by cross passages. The northern tunnel tube has a length of 4,128 m, and the southern tube has a total length of 4,187 m. After its completion, the Hirschhagen Tunnel will be Germany’s second longest motorway tunnel.
            Supplied equipments: Supply of 2 complete secondary lining trains composed of Formworks, Curing gantries, Reinforcement-Magazine gantries, Service Gantries.
Enlargement formwork for tunnel widening.
2 By-pass shutters for connections between the two tunnel lines.
Ancillary material such as connection collars and niches.
            Additional Services: 
                                Machine installation                    ,                                Concrete secondary lining works                    ,                                Machine Transformations                    ,                                Machine Removal                    ,                                Reinforcement Works                    ,                                Supervision                    ,            