Array ( [0] => 1 [1] => 3 [2] => 4 [3] => 7 )

Bank Station CU

Location: London - UK
Customer: Dragados
Working years: 2018 / 2019
Project information: Realization of the Secondary Lining for the following sections:
Moving Walkway
Running Tunnel
Platform Tunnel
Supplied equipments: Supply of a TSK modular Formwork for the secondary lining of the following sections:
 - TSS
 - TSN
 - Moving Walkway

The system was designed also to be converted for the construction of the Platform Tunnel.

Furthermore it was supplied a Formwork 12m long able to withstand full hydrostatic pressure with not fixings at the tunnel.
It was also possible to divide the formwork into 6m sections to comply with the tight tolerance of the curve.
Additional Services: Machine installation , Machine Transformations , Machine Removal , Supervision ,

Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm