Location: London - UK
Customer: BMB JV
Working years: 2021-2022
Project information:
Supplied equipments: The 7km long west section of the Thames Tideway Tunnel from Acton Storm Tanks site in West London towards Carnwath Road Riverside in South West London is being delivered by the BAM Nuttall, Morgan Sindall, Balfour Beatty joint venture.
KERN Tunneltechnik has engineered and supplied the most automated tunnel formwork system available on the market with live data analysis and PLC control units, comprising of 6 hydrostatic shutters, to support these works.
The Ø6.5m fullround formworks are moved and set by 2 multifunction gantries.
The system has been completely pre-assembled and tested in our workshop at KTS.
Furthermore KERN supplied a Logistic Crossing to handle the 350m3 of concrete required every day.
Additional Services:
Machine installation , Machine Removal , Supervision ,









Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).