22.10.2019 /

Platform Tunnel Shutter Installation

The Platform Tunnel Shutter has been installed at Bank Station CU site.


After the secondary lining in the Moving Walkway and the Running Tunnel, the PT will be the last section of the project for KERN.


Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm