21.11.2019 /
The Fullround Formwork for the Barn Elms connection tunnel has been successfully pre-assembled and delivered to jobsite.
The tunnel with a diameter of 2.2m is challenging in terms of work space for the operatives. For this reason, the shutter machine is equipped with a hydraulic interlocking system to ensure Health and Safety for the operatives and avoid manual work inside the steel form section.

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).