14.12.2020 /

Barn Elms - Tunnel Formwork Commissioning

The fullround tunnel formwork, designed and manufactured by KERN Tunneltechnik for Barhale and the BAM Nuttall, Morgan Sindall, Balfour Beatty joint venture, has been successfully installed and launched. 


The tunnel formwork, 6m long, is designed to build a final lining of 2.2m diameter of the Barn Elms sewage connection tunnel part of west section of the Thames Tideway Tunnel that the joint venture is delivering.
 
The machine is fully automated following KERN Tunneltechnick technology standards.



Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject