20.04.2021 /

First block of Brandberg rescue tunnel

On the 14th of April first block of Brandberg rescue tunnel was successfully casted. The design, engineering and manufacturing of the tunnel shutter was performed by KERN Group of companies. In addition, our KERN Lab divison performed simulation of a complicated launching procedure with a limited area in direct proximity to a busy road B294.








Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject