11.12.2025 /

High-Performance Bridge Formwork System for Major UK Infrastructure Scheme

KERN Tunneltechnik, in collaboration with MPD Construction Group, has successfully designed and delivered an innovative Bridge Formwork system that is now fully operational on MPD’s flagship UK infrastructure project.

The system, already achieving outstanding early performance, enabling the continuous day-and-night placement of more than 60,000 m³ of concrete.
Its reliability and efficiency are contributing significantly to the delivery of one of the UK’s largest and most ambitious infrastructure schemes.

Showcasing KERN’s advanced engineering capabilities, the Bridge Formwork system exemplifies the company’s market leading expertise in developing Integrated tunnel logistics solutions. These include bridge structures, flyovers, and turntable platforms engineered to boost productivity and support multi-tasking operations within complex and demanding underground environments.






Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject